• 09-08 2026
    Quick answer: samples take 3-4 working days; catalog LEDs from stock ship in 2 working days; standard production and custom production take 10-15 working days. Confirm the exact lead time in writing at quotation, and build buffer around holidays and capacity peaks. The Three Lead-Time Classes Stock items: popular bins of popular packages; shipment in 2 working days. Production items: standard part made to order; lead time is 10-15 working days. Custom items: special wavelength, formed leads, private label — sample lead time is 3-4 working days and custom production lead time is 10-15 working days. What Extends Lead Times Tight brightness or CCT bins (lower yield per run). Holiday shutdowns and capacity peaks — plan around them. Material substitutions (chip shortages ripple into packaging). Scheduling Habits That Work Ask for lead time per line item at quote ...
  • 09-08 2026
    Quick answer: LED MOQs come from reel sizes, production-line setup and bin yields — not arbitrary gatekeeping. Standard parts often start at one reel; custom parts need volume to justify setup. Why MOQs Exist Reel sizes: SMD LEDs ship 3,000-4,000 pcs per reel; a reel is the natural unit. Line setup: each production run requires die-bonder and wire-bonder setup regardless of quantity. Bin yield: a tight brightness bin yields only part of a run — tight bins need volume. Typical Structure Catalog parts: lowest MOQ, often a single reel or bag. Standard part, specific bin: moderate MOQ to guarantee bin yield. Custom wavelength/leads/label: highest MOQ plus possible NRE. Legitimate Ways Below MOQ Start with free samples for evaluation, then a pilot lot. Combine several models into one order to reach a program-level minimum. Accept a wider bin f...
  • 09-08 2026
    Quick answer: a useful sample request names the exact package, color/wavelength bin, brightness bin and lens — then you test the samples on your real PCB with your real process before approving. What to Include in the Request Package and dimensions (e.g. 0603, 5mm round, 5050). Color: dominant wavelength range, or CCT + bin for white. Brightness bin and test current if you know them — or describe the application. Lens/beam: water-clear, diffused, viewing angle. Quantity: 20-50 pcs covers evaluation plus assembly trials. What to Test on Arrival Electrical: Vf at your drive current; brightness vs the datasheet bin. Process: run them through your actual reflow or hand-solder profile, then re-test. Optical: in the real housing/light pipe, viewed from real angles. Keep the Paper Trail Label the golden samples, record the bin codes on the sample bag, and reference t...
  • 09-08 2026
    Quick answer: SMD LED price is driven by chip grade, bonding wire material, brightness/color bin, package type, order volume and customization. Two quotes can differ 2-3x because they are not quoting the same part. The Six Price Drivers Chip grade: A-grade epitaxial chips cost more and deliver tighter Vf and brightness spread. Bonding wire: 99.99% pure gold wire vs copper or alloy — reliability and price both follow. Bin tightness: a narrow brightness/CCT bin means lower yield, higher price — and uniform panels. Package: ceramic and high-power packages cost more than standard PLCC. Volume: price breaks at reel multiples and program volumes. Customization: special wavelengths, formed leads or private labels add NRE or unit cost. Making Quotes Comparable Send every bidder the same one-page spec: package, wavelength/CCT bin, brightness bin at test curr...